WhatsApp Adam 💬
The Problem Our Solution Hara Core™ GITA Savings Our Product Why Us 💬 WhatsApp Adam — Free Energy Audit ✉️ Email Adam
Malaysia's C&I Energy Storage Specialist

Cut Your TNB Bill.
Never Lose Power.
From Day 1.

HARA AI TECH deploys AI-powered commercial battery storage systems for Malaysian factories — reducing electricity costs by up to 40% while providing seamless backup power.

40%
Electricity bill reduction
~4yr
Payback after GITA savings
RM134K
Tax savings via GITA
Our Core Product

EXEN-100-215 Liquid-Cooling BESS

Energy Capacity215 kWh
Peak Power Output100 kW
Battery ChemistryLiFePO₄ (LFP)
Cooling SystemPrecision Liquid-Cooling
Protection RatingIP55 Outdoor
All-in PriceRM 280,000
IEC 62619IEC 62933 MyHijau Certified GITA Eligible
🏆 Government Incentive
GITA Tax Savings: RM 134,400
200% tax deduction on your BESS investment — claim up to RM 134,400 back. Valid until December 2026.

Malaysian Businesses Are Paying Too Much for Electricity

Three compounding challenges are driving energy costs to unsustainable levels — and they're getting worse.

TNB Tariff Surge

Maximum Demand charges account for 30–40% of your entire electricity bill. Every single kilowatt of peak demand costs RM 38 every month — whether you use it or not.

📊 A 300 kW peak = RM 11,400/month in MD charges alone
🔴

Grid Instability in Johor

The JS-SEZ data centre explosion is overloading Johor's power grid. Frequent voltage fluctuations and unplanned outages are causing costly production downtime.

💸 Each hour of downtime can cost RM 10,000–50,000
🌍

ESG & Carbon Compliance

Carbon taxes from 2025, ESG reporting mandates, and international buyer requirements are forcing factories to decarbonise — fast. Those who delay pay more.

📋 Carbon tax starts 2025. Are you ready?

Intelligent BESS That Works While You Sleep

One unit. Fully automated. Saves money every single month — without changing how your factory operates.

1

Charges During Off-Peak Hours

System automatically charges at the lowest TNB tariff rate — 10pm to 8am, and weekends.

2

AI Monitors Your Live Consumption

Hara Core™ reads your real-time power usage every 30 seconds during peak hours.

3

Discharges Before MD Threshold

The moment grid demand approaches your MD ceiling, BESS automatically kicks in and absorbs the spike.

4

TNB Records Lower Peak Demand

Your recorded MD drops — your monthly bill drops. Fully automatic. No staff involvement needed.

5

Backup Power on Grid Failure

If grid fails, BESS switches to backup power in under 100ms. Critical equipment keeps running.

RM 3,020
Max monthly savings
Standard E2 Tariff
RM 9,706
Max monthly savings
Medium Voltage ToU
215 kWh
Energy storage capacity
per unit
100 kW
Peak discharge power
per unit
<100ms
Backup power
switchover time
10yr+
System lifespan
with maintenance

💡 Zero Disruption to Operations

The BESS connects to your existing electrical infrastructure. No changes to your machinery, no production downtime, no staff retraining required.

Hara Core

The AI Brain Behind Every BESS

Hara Core™ is HARA AI TECH's proprietary AI Energy Management System — installed on every unit we deploy. It's what makes our BESS smarter than any competitor's.

🧠

Real-Time Demand Intelligence

Reads live power consumption every 30 seconds. Predicts MD breaches before TNB records them.

⚙️

Fully Autonomous Operation

No human input needed. Hara Core™ decides charge/discharge 24 hours a day, 365 days a year.

🔒

Hardware-Locked Exclusive

Each unit is hardware-bound to its licensed IPC. Cannot be copied, cloned, or transferred.

📡

Remote Monitoring & Alerts

Live dashboard accessible anytime. Instant alerts on performance anomalies or system events.

⚡ Hara Core™ Live Monitor
System Status ● Active — Discharging
Current Grid Load 287 kW
MD Ceiling Set 220 kW
BESS Output ↓ 67 kW discharging
Battery SOC 78%
MD Saved This Month RM 3,020 ✓

🤖 AI decision: Grid approaching 220 kW ceiling — BESS auto-discharge activated. TNB will not record above 220 kW this cycle.

How Much Can Your Factory Save?

Real numbers. Real savings. Based on actual TNB tariff structures.

RM 3,020
Monthly savings
Standard E2 Tariff
RM 9,706
Monthly savings
Medium Voltage (hospitals)
RM 134,400
One-time GITA
tax savings
~4 Years
Payback period
after GITA benefit

GITA — The Government Pays You Back RM 134,400

The Green Investment Tax Allowance turns your RM 280,000 investment into a much more attractive proposition. Here's exactly how.

💰 Your Real Investment After GITA

BESS Purchase Price RM 280,000
Green Financing (70%) – RM 196,000
Your Equity (30% upfront) RM 84,000
GITA 200% Tax Deduction on RM 280,000 RM 560,000 off taxable income
GITA Tax Cash Saved (×24%) – RM 134,400
Monthly TNB Savings + RM 3,020–9,706
Monthly Loan Repayment – ~RM 4,500
🎯 Net Monthly Cash Flow Positive from Day 1

✅ Your electricity savings pay the loan repayment — before counting a single ringgit of GITA tax benefit.

1

Buy from a MyHijau-Certified Supplier

HARA AI TECH's MyHijau certification ensures your purchase qualifies for GITA. Not all BESS suppliers are certified — we are.

2

Claim 200% Tax Deduction

Under GITA, you get a 200% tax deduction on your RM 280,000 investment — that's RM 560,000 off your taxable income.

3

Receive RM 134,400 Tax Cash Savings

At Malaysia's 24% corporate tax rate: RM 560,000 × 24% = RM 134,400 back in your company's pocket.

4

We Handle All the Paperwork

We guide you through MyHijau registration and GITA application from start to finish. One point of contact.

⏰ Act Before December 2026. The current GITA scheme is confirmed until 31 December 2026. Sign your LOI now to lock in RM 134,400 in guaranteed tax savings — no commitment required upfront.

EXEN-100-215 Liquid-Cooling BESS

Industrial-grade battery energy storage engineered for Malaysia's C&I sector — precision liquid-cooled, IP55-rated, and ready to deploy at your facility.

EXEN-100-215 BESS Unit — Front View
Front View

All-in-one outdoor cabinet design — compact footprint for easier transport, installation and site deployment.

EXEN-100-215 BESS Unit — Internal Structure
Internal Structure

Integrated LiFePO₄ battery rack, PCS, BMS, EMS, liquid-cooling system and fire-fighting system in one cabinet.

Electrical Specifications

EXEN-100-215 · LiFePO₄
Energy Capacity215 kWh
Rated Power Output100 kW
Battery ChemistryLiFePO₄ (LFP)
AC Output Voltage415 V (3-Phase)
System Efficiency≥ 90%
Cycle Life≥ 6,000 cycles
Calendar Life10+ Years
Depth of Discharge90%
Response Time< 1 Second
IEC 62619 IEC 62933 UN 38.3 GITA Eligible

Physical & System Specifications

Dimensions · Weight · Environment
Cabinet Height2,100 mm
Cabinet Width1,340 mm
Cabinet Depth1,400 mm
Total Weight≈ 2,600 kg
Cooling SystemPrecision Liquid-Cooling
Protection RatingIP55
Operating Temp.-10°C to +45°C
Humidity Range5% – 95% RH
CommunicationModbus TCP / RS485
IP55 Outdoor MyHijau Ready Hara Core™ Built-in

Your Complete End-to-End Energy Partner

We don't just sell hardware. We deliver measurable outcomes — from first site visit to decade-long performance.

🏛️

Sole Authorised Distributor

Malaysia's exclusive distributor for Exencell Liquid-Cooling BESS. Direct factory support, genuine warranty, and full technical documentation — not a grey-market reseller.

🤖

Proprietary Hara Core™ AI

Our exclusive AI EMS is tuned specifically for TNB's tariff structures. Generic BESS distributors sell hardware. We deliver intelligent, self-optimising energy management.

🔧

100% Turnkey Solution

Site assessment, system design, ST documentation, certified installation, commissioning. One point of contact. Zero hassle for your team.

💳

Zero Cash Outlay Financing

We assist with green financing applications — up to 70% of the investment. Use your TNB savings to repay the loan. Positive cash flow from Day 1.

🛡️

Factory Warranty Backed

Full manufacturer warranty with 80% battery capacity guarantee. Remote diagnostics and on-site support coordination from the Exencell technical team.

📋

GITA & MyHijau Support

We guide you through the entire MyHijau certification and GITA tax allowance application — maximising your government incentives without the paperwork headache.

Ready to Cut Your TNB Bill?

Get a FREE on-site energy audit — no obligation. We'll analyse your TNB bills and show you exactly how much you can save, with a custom ROI report.

Book My Free Energy Audit →

No obligation · Site visit within 5 working days · Custom ROI report included