WhatsApp Adam 💬
The Problem How It Works Live Monitor Optional BESS Pricing Why Us Factory Electricity Saving Guide FAQ Knowledge Hub 💡 Savings Calculator 🔐 Portal Login 💬 WhatsApp Us Now ✉️ Email Adam
HARA Core AI EMS for Malaysian Factories

Make Your BESS Smarter.
Control Peak Demand Automatically.

HARA Core connects to your factory load and BESS system to detect Maximum Demand risk, control discharge, and help reduce peak demand cost.

RM25K+
HARA Core Setup from RM25,000
RM6K+
Annual Care Plan from RM6,000/year
MD
Peak demand control for factories
Live Control Flow

HARA Core Peak Demand Control

ReadFactory load286 kW
DetectMaximum Demand risk82%
ControlBESS / PCS discharge-42 kW
MonitorLoad, status, savings37 kW saved
Meter / CTBESS / PCS DashboardMD Control
Optional Hardware Supply
Already have BESS or need one proposed?
We can integrate with compatible existing systems, or propose BESS separately after checking your bill and load profile.

Peak Demand Can Make a Good Month Expensive

Most factories do not lose money because of one big machine. They lose it when many machines peak at the same time and the TNB bill records a higher Maximum Demand.

Maximum Demand Charges

Your highest demand point can affect the bill for the whole month. A short production spike may become a recurring cost.

Peak demand needs to be controlled before TNB records it
🔴

Hard to See the Peak Coming

Manual checking is usually too late. Owners need a system that watches the load continuously and reacts at the right moment.

Live monitoring makes peak control practical
🌍

BESS Without Control

A battery alone does not guarantee savings. It must discharge during the right demand window and stay coordinated with factory load.

The control logic is what turns storage into savings

From Factory Load to Automatic BESS Discharge

One simple control flow: read the load, detect MD risk, discharge the BESS, reduce TNB peak demand, and monitor the result.

1

Read Factory Load

HARA Core reads your factory demand from meter, CT, or site monitoring point.

2

Detect MD Risk

The system detects when demand is about to exceed the preset limit.

3

Control BESS Discharge

HARA Core sends control commands to the BESS / PCS to discharge at the right time.

4

Reduce TNB Peak Demand

The factory uses stored energy during peak moments, reducing demand drawn from TNB.

5

Monitor Result

Dashboard shows load, peak demand, system status, and estimated savings.

Factory Owner View

What You Need to Know

GoalLower MD cost
InputMeter / CT data
ActionTimed BESS discharge
OutputDashboard result
Maximum DemandPeak ShavingBESS Control
HARA Core

See the Peak Before It Becomes a Cost

The live monitor shows demand, BESS output, MD ceiling, battery status, and the control action taken by HARA Core.

📊

Simple Dashboard

Factory owners can quickly see whether the system is active and what it is doing.

🔔

Status and Alerts

Key system conditions are visible without heavy technical reading.

⚡ HARA Core Live Monitor
System Status● Active — Peak Shaving
Current Grid Load287 kW
MD Ceiling Set250 kW
BESS Output↓ 42 kW discharging
Battery SOC76%
MD Saved This Month37 kW

🤖 HARA decision: Grid load is approaching the MD ceiling. BESS discharge activated to keep recorded demand under control.

Potential Savings Depend on Your Bill and Load Profile

These figures are examples for discussion, not guaranteed savings. Actual savings depend on TNB bill, load profile, MD pattern, BESS capacity, and site condition.

RM 8,927
Example monthly MD reduction
for discussion
RM 9,706
Possible higher-impact
site scenario
RM 134,400
Optional incentive discussion
if applicable
~4 Years
Indicative payback
after bill review

Already Have BESS? No BESS Yet? Both Are Possible.

Already have BESS? We can integrate HARA Core with your existing system. No BESS yet? We can propose a compatible BESS system after checking your TNB bill and load profile.

EXEN-100-215 BESS front view
Optional BESS Example

A compatible C&I BESS can be proposed separately when your site does not already have storage.

EXEN-100-215 BESS internal view
Integration Ready

Final model, kW, kWh, backup requirement, and installation scope are confirmed after site review.

Optional BESS Supply

For existing BESSIntegrate HARA Core
For new BESSPropose after review
SizingBased on kW / kWh
RequirementPeak shaving / backup
PricingQuoted separately

Optional BESS supply is separate from HARA Core setup and annual care plan.

1

Send Bill or BESS Details

We first check your TNB bill, load profile, and existing system information if available.

2

Confirm Integration Path

We identify whether HARA Core can connect to your existing BESS / PCS, or whether a new BESS should be proposed.

3

Quote Clearly

HARA Core setup, annual care plan, and optional BESS supply are separated in the proposal.

This keeps the decision simple: HARA Core only, or HARA Core with a proposed BESS solution.

Clear Scope, Separate Items

HARA Core setup and annual care plan are separate from optional BESS supply, so customers know what they are paying for.

HARA Core Setup

From RM25,000
Site checkingIncluded
Meter / CT reading setupIncluded
HARA Core controller setupIncluded
BESS / PCS integration supportIncluded
Dashboard accessIncluded
Testing and commissioningIncluded
Setup from RM25,000HARA Core

Annual Care Plan

From RM6,000/year
Monitoring supportIncluded
System checkingIncluded
Basic tuningIncluded
Remote supportIncluded
Report / performance reviewIncluded
Annual billingRemote support

Optional BESS Supply

Quoted separately
Factory requirementReviewed
Power ratingkW
Energy capacitykWh
Site conditionChecked
Backup requirementOptional
Separate quoteOptional

Final scope depends on site condition, communication compatibility, number of meter points, number of BESS / PCS points, and any extra hardware or site visits required.

Simple Scope. Practical Integration.

We keep the proposal clear so factory owners can compare options and decide with confidence.

🔌

Brand-Neutral BESS Integration

HARA Core is designed to work with compatible BESS and PCS systems, not locked to only one brand.

📋

Clear Scope & Pricing

HARA Core, annual care plan, and optional BESS supply are clearly separated so customers know what they are paying for.

🤝

Optional BESS Supply

Customers can choose HARA Core only, or HARA Core with a proposed BESS solution.

Built in Johor Bahru for Practical Factory Energy Control

HARA AI TECH SDN BHD was built in Johor Bahru to help factories control energy cost using practical BESS integration, peak demand control, and smart monitoring technology. Our focus is simple: help business owners understand their energy usage and reduce unnecessary peak demand cost.

H Hybrid Combining factory load and storage control
A Autonomous Automatic action when peak risk appears
R Resource Energy data made useful for owners
A Architecture A clear control layer for BESS projects

Hara (腹) — Japanese

In Japanese, 腹 refers to the body's energy centre — the core from which all strength flows. We put intelligent energy at the centre of your operations.

🎯
Our Mission

Make Peak Demand Easier to Control

We help factories turn load data, BESS integration, and dashboard visibility into practical action.

🔭
Our Vision

Practical Energy Technology for Malaysian Factories

Our long-term aim is simple: clearer energy decisions and less wasted peak demand cost.

CHARGE UP ⚡

Johor Bahru · Malaysia · Est. 2025

Want to know if HARA Core fits your factory?

Send us your TNB bill, load profile, or BESS details. We will check whether HARA Core can help reduce your Maximum Demand cost.

WhatsApp Us Now

Send a TNB bill, load profile, or BESS details for a first review.